Case Study 1A four story office building in Desoto, Texas Existing Air Conditioning System: Carrier Roof Top Package Units Installed when building was built over 25 years ago. Units were operating fine, but having break downs too often for the owners. System had been upgraded and refurbished many times. Failures had moved from normal wear and tear items to equipment panels, blowers and frames. A full automation system had been installed which allowed the customer to find, receive advance warnings and document equipment failures. Customer financed eguipment upgrade, through leasing of new equipment. The primary benefit was that the reduced electrical consumption paid for the new equipment. The new Trane roof top units have proven to be reliable and reduced the repair cost of the air conditioning system by more than half, compared to the original equipment.
|
||
LIC TACL A0059346 ST PLBG M16213 |
||
©2005 Professional Service Company DBA of BCJ Professional Mechanical Service Company Inc Website Design by Desiree Jenkins |